Argument for Dismissal for Lack of Certificate of Merit Lacked Merit
August 24, 2012The court reversed the dismissal of a claim against an engineering consultant in an opinion dealing with the “certificate of merit” requirement in section 150.002 of the Texas Civil Practice and Remedies Code. Though there was no written contract between JJW and Strand, JJW originally asserted claims against Strand for breach of contract and negligence arising from a cracked foundation Strand designed. JJW later dropped its negligence claims and asserted only the contract action against Strand in its third amended petition, claiming that it entered an oral or implied contract with Strand to perform a “pre-pour” inspection of the foundation. JJW alleged that Strand breached this contract by failing to measure the depth of the concrete slab. Strand moved to dismiss the action because JJW failed to file a certificate of merit with its petition. JJW responded that the applicable 2005 version of section 150.002 does not apply to a claim for breach of contract. The trial court dismissed the claim.
On appeal, the court first held that it would consider the live pleadings at the time of the trial court’s ruling on the motion to dismiss to determine whether and how section 150.002 applied to the plaintiff’s claims. Examining the third amended petition, the court agreed with the majority of the Texas courts of appeals and held that the 2005 version of section 150.002 requires a certificate for negligence claims only and not for non-negligence claims. In doing so, the court rejected the approach recently taken by an en banc panel of the Austin court of appeals. The court noted, however, that it still must determine whether JJW’s contract claim was truly based on Strand’s alleged contractual obligations to JJW or was merely a negligence claim recast as breach of contract.
To determine the nature of the claim, the court looked to the source of the duty owed and the nature of the remedy sought. The court held that because JJW alleged that Strand had an express or implied contractual obligation to measure the depth of the slab – independent from its duty to exercise a professional degree of care, skill, and competence in performing the pre-pour inspection – the duty arose from the contract. The court also held that the remedy – consequential damages for the diminution in value of the residence and the loss of use and other damages due to necessary repairs – was based in contract because those damages are “consequences of the alleged failure to perform a pre-pour inspection.” Thus, the court concluded that the nature of the claim was, indeed, contractual.
JJW Development, LLC v. Ramer Concrete, Inc. and Strand Systems Engineering, Inc., 05-10-01359-CV