You Didn’t Build This
November 15, 2012The court affirmed a judgment in a construction contract dispute between two subcontractors. The general contractor of a shopping center project, Mycon, subcontracted with Bulldog to fabricate the steel and erect the steel-reinforced concrete panels around the center’s trash dumpsters. Bulldog subcontracted Top Flight to erect the panels. Top flight testified that Mycon directed the concrete pouring to take place well outside of the range that Top Flight had instructed. Top Flight then requested a $7,500 change order from Bulldog for the extra erection cost, which Mycon refused. Under pressure from Mycon, Bulldog eventually installed the panels themselves, without notifying Top Flight, and then invoiced and eventually sued Top Flight for the cost of installation. Top Flight counterclaimed for the 10% retainage amount left on the contract. Finding that Bulldog did not notify Top Flight to complete installation of the panels breached the subcontract by preventing Top Flight’s performance, the trial court rendered judgment for Top Flight for its retainage, interest, and attorney’s fees.
On appeal, Bulldog did not challenge the trial court’s finding that Top Flight was never notified to complete the installation of the dumpster panels despite the extra cost, and without allowing Top Flight an opportunity to perform, Bulldog undertook to install the dumpster panels using its own employees. The court held the fact that Bulldog prevented Top Flight from performing under the contract, which supported the conclusion that Top Flight did not breach the contract and that Bulldog did.
Bulldog Ironworks, LLC v. Top Flight Steel, Inc., 05-10-01360-CV